STOCKMEIER Holding SE, Bielefeld
Am Stadtholz 37
33609 Bielefeld

+49 521 / 3037-0
+49 521 / 3037-159

Open menu Close menu

Clarksburg, West Virginia site invests in new production equipment

STOCKMEIER Urethanes USA recently installed new ovens in the West Virginia manufacturing plant to expand their melting capacity.

New ovens moving into STOCKMEIER Urethanes USA
Picture 1

The ovens were placed in a location that streamlines the handling of materials. The companies involved who made this project successful were Digging & Rigging and LEWCO. Site employees, Cherilyn Woodland (Project Engineer) and Roger Stover (Maintenance Supervisor), made sure the project ran smoothly which was completed ahead of schedule.

In addition, a new automated pailing station was installed at the plant. The new equipment applies the labels, stacks pails on pallets, and stretch wraps. The design is both ergonomic and efficient for operators. Those who completed yet another successful project was SWS PackagingKinesys, and Cherilyn.

New equipment moving into STOCKMEIER Urethanes USA
Picture 2
new production equipment moving into STOCKMEIER Urethanes USA
Picture 3